







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Bufftech Home Additions & ADU: The Fort Lauderdale Owner’s Guide
If you own a Bufftech home addition or ADU in Fort Lauderdale and a part has failed or is failing, we stock the compatible components and handle the replacement work. Installed pricing for Bufftech home additions and ADUs in Fort Lauderdale runs $45,000 to $130,000 for full additions, with ADU construction ranging $90,000 to $220,000, and smaller parts-level repairs like a failed panel, post, or trim run far less. Most owners discover a failing part the same way: a door that no longer closes square, a post that has shifted off its footing, or a section that has pulled away from the main structure after a summer of humidity and salt air.
We’re Sawyer Remodel Fort Lauderdale, an independent service provider. We’re not affiliated with Bufftech, but we work with their components regularly across this market and know exactly what fails, why it fails here, and what it costs to make it right.
Which Bufftech Models This Applies To

Bufftech components show up most often in Fort Lauderdale on two project types: freestanding ADUs and attached home additions with a mix of panelized and site-built framing. The compatibility question always comes down to the same three checks. First, the series label: Bufftech stamps a batch code on most structural posts and panels, usually on the interior face near a corner. Second, the post dimensions: 4×4 versus 6×6 makes a real difference in what replacement hardware and footings you need. Third, the panel profile: Bufftech runs a smooth, a woodgrain, and a board-and-batten profile, and they don’t interchange cleanly without visible seams.
The OEM-versus-aftermarket decision is straightforward for most Bufftech components. For trim, post caps, and non-structural panels, a quality aftermarket equivalent in the same dimensions holds up fine and often ships faster. For structural posts, corner assemblies, and anything load-bearing in a Fort Lauderdale addition, we order Bufftech-spec parts. The wind uplift requirements here are not a place to test a generic substitute. If the part number has worn off, we can usually identify the series from measurements and the age of the original permit.
Styles & brands we work with







Signs Your Bufftech Home Additions & ADU Is Failing
- Door or window bind in the frame. Florida humidity and soil settlement cause posts to shift incrementally. When the opening is no longer square by even a quarter inch, the binding starts.
- Gap opens between the addition and the main house. This is the one owners notice first. It’s usually a footing issue under a corner post, not the panel itself, and it won’t resolve on its own.
- Bottom of a post shows cracking or crumbling. Salt air and groundwater wick into the base of posts that sit in standing moisture. Once the bottom third shows spalling, the post has lost bearing capacity.
- Trim pulls away from panels at the corners. The fasteners usually outlive the surrounding material here. What you’re seeing is expansion and contraction working the fasteners loose over several seasons.
- Soft spots or rot visible behind the panel face. By the time it shows on the outside, the moisture problem has been working for a while. The replacement usually involves more than just the visible panel.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For a full Bufftech home addition in Fort Lauderdale, expect $45,000 to $130,000 depending on square footage, foundation type, roof tie-in complexity, and finish level. ADU construction runs $90,000 to $220,000. But most calls we get are parts-level repairs, not full builds. A failed post replacement typically lands between $800 and $3,000 installed, including the footing repair underneath it. A section of panel replacement runs $1,500 to $5,000 depending on how much framing and flashing behind it also needs addressing.
Every quote we write includes the parts, the labor, the disposal, and the warranty in the same number. There’s no change order at the end because the price was written before any work started. If a repair fails within a year, the second visit is free under our 365-Day Done Right Promise. That’s what The Relay Standard means on a Bufftech repair: live arrival time, photo updates, and a written price before a tool comes off the truck.
DIY or Call Us?
Here’s the honest split. You can safely inspect what’s failing: check for visible cracking at post bases, measure the gap at any separating corner, and note whether doors bind in the same spot every season. What you should not do is pull a structural post or panel off a load-bearing addition yourself. A post replacement on a Bufftech ADU with roof load on it is a real structural job, not a weekend fix. If the roof is bearing on that post, the temporary shoring has to be right before anything gets unbolted. If it’s wrong, the failure is fast and expensive.
Luca Romano has seen enough of these older Fort Lauderdale additions to know that what looks like a simple part swap is usually a footing issue or a flashing failure underneath. If you’re not sure what you’re looking at, call (754) 354-7423 and we’ll tell you over the phone whether it’s worth a service visit.
FAQs

In Fort Lauderdale’s humidity and salt air, correctly installed Bufftech structural posts typically last 15 to 25 years before needing serious attention. The lifespan varies heavily by exposure: posts on the east side of a structure that take full afternoon sun and driving rain will fail faster than a shaded interior corner. Proper flashing and a drainage gap behind the panels are the two things that push the number toward the high end. If yours failed at year ten, it’s almost always a drainage or flashing problem. Call (754) 354-7423 if you want us to look at the specific failure pattern before quoting the repair.
In most cases with visible cracking, spalling, or rot at the base, the post needs replacement rather than repair, because the bearing capacity is already compromised and a patch doesn’t restore it. Minor surface cracking in a non-structural post can sometimes be sealed and monitored. The deciding factor is whether the post carries roof load. If it does, we replace it. Call (754) 354-7423 and we’ll tell you which category yours falls into, based on photos or a quick visit.
A typical single-post replacement on a Fort Lauderdale home addition or ADU takes one day on-site, including the footing repair, new post set, and re-flashing. Panel sections usually run one to two days depending on how much framing and flashing behind the panel has also failed. If the part has a lead time for a Bufftech-spec item, we tell you before we quote so there are no surprises. Call (754) 354-7423 for an exact timeline on your specific repair, and the estimate is free.
We keep common trim profiles, post caps, fasteners, and generic panel stock on the truck for the most frequent Fort Lauderdale repair jobs. Bufftech-spec structural posts and specific panel profiles are typically ordered per job, with lead times we confirm before the quote goes out so you know the full schedule up front. If there’s a good aftermarket equivalent in the right dimensions, we’ll tell you that too, and the price difference. Call (754) 354-7423 and we’ll check availability for your specific part while you’re on the phone.
Written by Luca Romano, Owner & Lead Contractor, Sawyer Remodel Fort Lauderdale at Sawyer Remodel Fort Lauderdale, serving Fort Lauderdale and nearby areas.


