A Sawyer company - serving Fort Lauderdale, FL
A new rear addition with a vaulted beamed ceiling and tall windows

Construction Permits, Codes & Inspections in FL: What You Need to Know

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Lauderdale

Last updated October 16, 2026

A wide opening with a new beam where the kitchen wall was removed
A garage converted into a guest room and home office
A finished basement family room with a media wall and wet bar
A walk-in pantry with wood shelving
A powder room with botanical wallpaper and a stone sink
A remodeled laundry and mudroom with a bench, cubbies and painted cabinets
A built-in window seat in a bay window
A dining nook with a built-in banquette
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

Construction Permits, Codes & Inspections in FL: What You Need to Know

If you sell a Fort Lauderdale home with unpermitted additions, you are legally obligated to disclose them, and buyers’ lenders frequently require permits to be pulled retroactively before closing, at costs that dwarf the original permit fee. The moment a contractor tells you “we can skip the permit to save you money” is the moment to walk away, because unpermitted work in Florida follows the property deed, not the contractor who did the job. This guide explains how Florida’s permitting system actually works, what Broward County and Fort Lauderdale specifically require, and how to protect yourself before, during, and after a remodel. For ongoing upkeep tips, see our General Contractor Maintenance Checklist for Fort Lauderdale Homeowners. You’ll learn what triggers a permit, what happens when an inspection fails, why South Florida’s hurricane code is stricter than anywhere else in the state, and how to check a home’s permit history before you buy it.

Call (754) 354-7423

Quick Answer

Most structural, electrical, plumbing, and mechanical work in Florida requires a permit, and in Fort Lauderdale and Broward County, High Velocity Hurricane Zone (HVHZ) rules make those requirements stricter than the rest of the state. Skipping permits saves a little money upfront but creates a legal liability that attaches to your deed, surfaces when you sell, and can cost five to ten times the original permit fee to resolve retroactively. The smart move is to verify your contractor pulls permits for every job that requires them, and to confirm the permit is closed, not just issued, before you make the final payment. Not sure whether to tackle a project yourself? Read our DIY vs Professional Construction: The Fort Lauderdale Homeowner’s Decision Guide.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Table of Contents

What Actually Requires a Permit in Florida

Florida Statute 553.79 is the backbone of the state’s permitting system. It says, plainly, that a building permit is required before a person may construct, enlarge, alter, repair, move, demolish, or change the occupancy of any building or structure. That’s a broad net, and it catches a lot of work that homeowners assume is fine to do without paperwork. The intent is simple: a permit creates a paper trail that proves the work was done by someone who knew the code, and that an inspector actually looked at it. Without that trail, you’re trusting a stranger’s word that hidden wiring won’t burn your house down.

In our experience remodeling homes across Fort Lauderdale, we’ve found that the work most likely to require a permit falls into four categories:

  • Structural work: Removing or altering load-bearing walls, cutting new window or door openings in exterior walls, adding a room, changing rooflines, or installing a new roof deck. Any change to how the building carries weight requires a permit and engineering review.
  • Electrical work: New circuits, panel upgrades, rewiring, adding outlets or fixtures where none existed, installing a generator, or any service change. In Florida, swapping a light fixture or outlet like-for-like is generally exempt, but adding a new one is not.
  • Plumbing work: Moving a sink, toilet, or shower drain, adding a bathroom, replacing a water heater, installing a new gas line, or re-piping any portion of the supply or drain system. Fixture replacement in the same location is usually exempt; moving it is not.
  • Mechanical work: Replacing an air conditioning system, installing ductwork, adding a mini-split, or changing out a water heater. In South Florida, AC replacement specifically requires a permit, and so does any alteration to the duct system.

Here’s the part most homeowners in Fort Lauderdale don’t realize until it’s too late: cosmetic work is generally exempt, but the line between cosmetic and structural is thinner than it looks. For a deeper look at jobsite safety requirements, see our Construction Warning Signs: A Fort Lauderdale Homeowner’s Reference Guide. Painting, flooring, cabinet refacing, countertop replacement, and trim work do not require permits. But the moment you move a wall, touch a drain line, or add a circuit, you’ve crossed into permitted territory. A bathroom remodel that keeps every fixture in its original location might need no plumbing permit at all. Move the toilet three feet to the left and now you need a plumbing permit, floor penetration review, and likely an inspection of the new trap and venting.

For homeowners working with a General Contractor in Fort Lauderdale, the permit question should be settled before the contract is signed. A legitimate contractor will tell you what needs a permit, what it costs, and who pulls it. A contractor who waves the permit away is making a choice that saves them time and protects them from inspection scrutiny, at your long-term expense.

Broward County Permit Thresholds That Trip Up Homeowners

Broward County has its own amendments to the Florida Building Code, and some of the thresholds here are specific enough that they catch even experienced homeowners off guard. These are the ones we see cause the most problems in Fort Lauderdale:

Fence replacement over 50%. If you replace more than half of an existing fence in Broward County, you need a permit. Replace a few rotted panels and you’re fine. Replace the whole run because a hurricane took it down, and you’re technically required to pull a permit, even for a like-for-like replacement. The permit verifies setback compliance and wind-load anchoring.

Window and door replacement. In Broward County, replacing windows or exterior doors requires a permit, full stop. This is not a threshold question; it applies to every replacement, including swapping a single window. The reason is HVHZ impact-rated requirements, which we’ll cover below. Your window installer should check that the new units meet the specific wind-load and impact requirements for your home’s location.

Siding and exterior cladding. Replacing more than 25% of your home’s exterior siding or stucco in a single year triggers a permit in Broward County. This is designed to catch situations where water intrusion behind old siding needs to be inspected when the cladding comes off.

Drywall repair over a specific square footage. In Broward County, patching drywall under one 4×8 sheet (32 square feet) is typically exempt. Anything larger requires a building permit, because at that scale the county wants to confirm the underlying framing and fire separation are intact. This catches a lot of homeowners who plan a large water-damage repair.

Water heater replacement. Plumbing fixture swaps are generally exempt, but water heaters are specifically called out in Broward County as requiring a permit. The inspection verifies seismic strapping, temperature and pressure relief valve installation, and that the flue or venting is correctly sized and routed.

The takeaway for Fort Lauderdale homeowners: when in doubt about whether a threshold applies, call the city’s Development Services office or ask your contractor for the specific code section. A five-minute conversation beats a stop-work order, which is what happens when an inspector drives by, sees unpermitted work in progress, and posts a red tag on your front door.

Florida’s High Velocity Hurricane Zone: Why Broward and Miami-Dade Are Different

Florida is divided into two wind zones under the Florida Building Code: the High Velocity Hurricane Zone (HVHZ) and everything else. The HVHZ covers Miami-Dade County and Broward County only. That’s it. Two counties out of sixty-seven. If you’ve ever wondered why a roof replacement in Fort Lauderdale costs more than the same roof in Orlando or Tampa, the HVHZ designation is the answer.

The HVHZ code is built around the assumption that a building will take a direct hit from a Category 4 or Category 5 hurricane. That means stricter requirements for:

  • Roofing: Systems must withstand uplift pressures that would rip a standard roof off in minutes. Specific attachment patterns, nail sizes, and underlayment requirements are mandated, and no roof replacement in Fort Lauderdale is allowed without a roofing permit that confirms compliance with the current HVHZ code.
  • Windows and doors: Every exterior opening must be impact-rated or protected by an approved shutter system. In Broward County, replacement windows must meet specific design pressure ratings for the home’s exact wind zone and exposure category. If you’re working with GAF roofing materials or CertainTeed products on a Fort Lauderdale remodel, those products need HVHZ-compliant installation methods.
  • Wall construction: Wall-to-floor and wall-to-roof connections must be engineered for uplift. When a remodel opens a wall, the inspector verifies that the existing structural connections meet current HVHZ standards, and retrofits are sometimes required before the wall can be closed.
  • Screening and enclosures: Pool cages, screen enclosures, and carports must be engineered for the HVHZ wind load, which is why a Fort Lauderdale pool enclosure costs dramatically more than the same enclosure anywhere else in Florida.

Here’s the practical impact for a homeowner planning a remodel: if you buy an older Fort Lauderdale home built before the current HVHZ code took effect, any permitted remodel that touches the building envelope may trigger required upgrades to bring the whole assembly into compliance. A simple window replacement can turn into a structural retrofit if the inspector finds that the wall-to-floor connections don’t meet the current standard. A good contractor will flag this possibility before you sign, not after the wall is open. Our team at Sawyer Remodel Fort Lauderdale’s home renovation services includes this in every scoping conversation, because finding out mid-project is the kind of surprise that destroys trust.

How the City of Fort Lauderdale Permitting Process Works

Fort Lauderdale processes permits through its Development Services department, which now runs largely through an online portal called LauderBuild. Homeowners and contractors can both create accounts, submit applications, upload plans, pay fees, schedule inspections, and track the status of a permit all from a phone or laptop. For a city known for bureaucracy, the portal is genuinely functional, which matters more than it sounds: you should be able to see the status of your permit in real time, the same way you track a package.

Here’s the step-by-step flow for a typical Bathroom Remodeling in Fort Lauderdale project with plumbing changes:

  1. Application submitted. Your contractor creates a permit application in LauderBuild, attaches the scope of work, and pays the intake fee. For a bathroom remodel with fixture moves, this typically includes a plumbing riser diagram and a floor plan showing old and new locations.
  2. Plan review. The application routes to plan reviewers in each relevant trade. A bathroom remodel with plumbing and electrical changes goes to both the plumbing reviewer and the electrical reviewer. Plan review for a non-structural remodel typically takes 3 to 10 business days in Fort Lauderdale, depending on current queue volume.
  3. Fees assessed. Once plan review passes, the permit fee is calculated based on the valuation of the work. You pay online and the permit is issued, which means it’s now an open permit on your property’s record.
  4. Work begins. Inspections are called in at specific stages. For a bathroom remodel, that’s typically a rough-in inspection for plumbing and electrical before the walls are closed, followed by a final inspection once everything is complete.
  5. Inspections passed. When all required inspections pass, the inspector signs off and the permit moves from open to closed status. The city sends confirmation and the closed permit becomes part of the permanent property record.
  6. Final payment released. You should not make the final payment on any remodel until the permit is closed. A closed permit is proof the city inspected and approved the work.

For structural projects like room additions or load-bearing wall removal, the timeline stretches. Plan review typically runs 2 to 4 weeks, sometimes longer if engineering review is required, and the permit fee is based on the full construction valuation. A structural remodel in Fort Lauderdale should be expected to take 4 to 8 weeks from application to permit issuance, and a good contractor builds that time into the project schedule rather than treating it as an afterthought. The Sawyer Remodel Fort Lauderdale home team includes permit timelines in every written estimate, so you know the real project start date, not the optimistic one.

What a Failed Inspection Actually Means

A failed inspection is not a catastrophe, but it is a signal. Here’s what actually happens, step by step, and who is responsible for what in Fort Lauderdale.

When an inspector arrives and finds work that does not meet code, they write up a deficiency report and the permit goes into a “failed” or “re-inspection required” status. The contractor then has a window of time, typically 30 days in Fort Lauderdale, to correct the identified issues and call for a re-inspection. Re-inspection fees apply and are posted on the permit record. In our experience, a single failed inspection on a complex remodel is common and usually means a minor fix, like a missed nail pattern or a ground wire that needs repositioning. Two or three failures on simple work is a red flag about the contractor, not the code.

What gets red-tagged? A red tag is the term for a stop-work order, and it’s different from a failed inspection. A red tag happens when an inspector finds work being done with no permit at all, or work that has progressed significantly beyond the scope of the issued permit. A red tag plastered on your door means all work stops immediately. The contractor cannot proceed, you cannot sell the house, and the permit office now has an open enforcement case tied to your property address. Getting a red tag lifted requires pulling the correct permit, paying double or triple fees as a penalty, and in the case of work already completed, opening walls so an inspector can see what was hidden.

Here’s the part homeowners need to hear clearly: the remediation cost belongs to the homeowner, not the contractor. If a contractor does unpermitted work, gets paid, and walks away, the city’s enforcement action is against the property owner. The open violation attaches to your deed. You can sue the contractor in civil court, but the city doesn’t care about the contract dispute; they want the work brought into compliance, and you’re the one who owns the problem. In Fort Lauderdale, we’ve seen unpermitted bathroom remodels cost between $8,000 and $25,000 to remediate retroactively, once wall demolition, new permits, penalty fees, and re-inspection costs are tallied. The original permit fee for that same remodel would have been a few hundred dollars.

Inspection frequency is another point where homeowners get surprised. A permit is not one inspection; it’s a series. A full bathroom remodel with plumbing, electrical, and structural changes may require four or more separate inspection visits: rough-in plumbing, rough-in electrical, insulation, and final. Your contractor should schedule each one and update you on results. If a contractor tells you the permit was pulled but you never see an inspector arrive, the permit may have been issued and then abandoned, which is a problem we’ll cover below.

How to Check the Permit History on Any Home

Before you buy a home in Fort Lauderdale, or before you start a remodel on a home you already own, checking the permit history is one of the most valuable things you can do, and it’s free. Here’s how it works:

  1. Search the LauderBuild portal. The City of Fort Lauderdale’s LauderBuild system allows anyone to search by property address and see a list of permits associated with the property, past and present. You don’t need an account for a basic search, and it shows permit numbers, issue dates, descriptions of work, and current status.
  2. Look for the status column. Each permit will show either “open,” “closed,” “expired,” or “void.” A closed permit is good; it means work was inspected and approved. An open permit means the permit was issued but never finalized, which usually means work was done and never inspected, or work was started and abandoned.
  3. Note expired permits. An expired permit is an open permit whose clock ran out. In Fort Lauderdale, building permits expire if work doesn’t begin within a set time, or if inspections stop for an extended period. An expired permit is a problem: the city considers the work unpermitted even though a permit number exists.
  4. Cross-check the property appraiser records. The Broward County Property Appraiser’s website shows the square footage and bedroom count on record. If the appraiser square footage doesn’t match the actual square footage you can see standing in the house, someone did unpermitted work, usually an addition or enclosed garage.
  5. Look for gaps in history. A 1950s Fort Lauderdale home with a completely modern kitchen and no kitchen remodel permit in the LauderBuild history is a strong signal that the work was unpermitted. The work might be perfectly fine, but you’re buying a liability, not just a house.

Open or expired permits signal something specific about the previous contractor: they either didn’t finish, didn’t get inspections, or didn’t care enough to close out the paperwork. A closed permit history, on the other hand, tells you the work was done by someone who followed through, and that the city saw and approved the final result. When we inherit a project with open permits, part of our job is closing them before we start new work, because a new permit will not be issued until the old one is resolved, and the new inspector will be looking at the old work too.

For a homeowner selling in Fort Lauderdale, open permits are a disclosure issue. Florida law requires sellers to disclose known defects and open violations, and a title search will surface open permits during the closing process. Lenders increasingly require closed permits before loan approval on properties with recent remodel history. The fix is rarely cheap: pulling a retroactive permit requires opening walls, scheduling inspections, paying penalties, and sometimes replacing work that does not meet current code, even if the work itself was functional.

What Permits Cost in Fort Lauderdale and Broward County

Permit costs in Fort Lauderdale are calculated based on the valuation of the work, meaning the total cost of labor and materials for the permitted scope. It’s a sliding scale, not a flat fee. Here’s the ballpark for common residential projects:

Project Scope Typical Fort Lauderdale Permit Cost
Water heater replacement $50 to $150
Window or door replacement (up to 10 units) $100 to $300
Bathroom remodel (fixtures in place, no structural) $200 to $600
Bathroom remodel (fixtures moved, new plumbing) $400 to $1,000
Electrical panel upgrade $150 to $400
AC replacement $100 to $350
Roof replacement (full) $500 to $1,500
Room addition or structural remodel $1,500 to $5,000+

These are the city’s fees only. They do not include engineering drawings if required, plan review overtime if you need to expedite, or re-inspection fees if an inspection fails. For a structural project, engineering drawings can add $800 to $2,500 depending on scope. For a whole-home remodel in Fort Lauderdale, you should expect to budget $2,000 to $6,000 for the permit package end to end, depending on whether structural and mechanical changes are involved. That’s a real cost, and a dishonest contractor will offer to “save” it for you by skipping the permit. The savings never survive contact with reality: unpermitted work costs more to remediate than the permit would have cost in the first place, every single time.

One nuance in Fort Lauderdale: permit applications and fees are the homeowner’s responsibility in the sense that the permit is issued in the homeowner’s name, even when a contractor handles the paperwork. The contractor is listed as the qualifier, meaning they’re the one who holds the license and pulls the permit, but the permit belongs to the property. If you fire a contractor mid-project, the open permit remains on your property record, and you’ll need a new contractor to take over the permit, which requires a change of qualifier form with the city. This is another reason to verify that whoever pulls your permit is licensed and insured in Florida, not working under someone else’s license number.

Open Permits vs. Closed Permits: Why the Difference Matters

This distinction causes more confusion than any other part of the permitting process, so let’s be direct: an open permit is a permit that has been issued but has not received final inspection approval. A closed permit is a permit where all required inspections have passed and the city has signed off. The difference sounds like paperwork, but in Fort Lauderdale, it’s the difference between a legal remodel and a liability.

A contractor who says “the permit is pulled” is telling you something true but incomplete. Pulling a permit means the city approved the plans and issued a permit number. It does not mean the work passed inspection. We’ve seen properties where a contractor pulled a permit, did the work, never called for a single inspection, and walked away with a permit sitting open. The homeowner believed the remodel was fully permitted, and technically, the work was permitted: it was just never verified. When that work fails, or when the sale of the home hits the title check, the open permit becomes a problem.

Here’s what to remember before making final payment on any remodel:

  • Verify the permit number. Ask for the permit number and look it up yourself on LauderBuild. You should see your address, the permit scope, and the current status.
  • Verify the inspection history. The permit record will show every inspection called and every inspection result. A permit with no inspections listed means the contractor did unverified work.
  • Make final payment contingent on a closed permit. This is the single most effective protection a homeowner has. Put it in the contract: final payment is due only after the permit status shows “closed.” A contractor who pushes back is telling you something about their inspection confidence.

In Fort Lauderdale, a closed permit also does something else that matters: it updates the county’s property record, meaning the work is now part of the legal, described square footage and use of the home. That’s why a closed permit helps when you sell: the buyer’s appraiser can use the updated square footage, and the title commitment comes back clean. An open permit does the opposite, creating a title defect that lenders flag before closing.

Common Mistakes to Avoid

  • Believing “it’s just cosmetic” without checking. Painting and flooring are exempt, but replacing a window, moving a sink, or adding an outlet is not. In Broward County, even a like-for-like window replacement requires a permit. If you’re unsure, the five-minute phone call to Development Services is cheaper than a red tag.
  • Paying in full before the permit closes. Final payment should always be contingent on a closed permit. A contractor who demands final payment while the permit is still open is asking you to accept the risk of unverified work, and in Fort Lauderdale, that risk includes title problems when you sell.
  • Trusting that a permit was pulled without checking. Ask for the permit number and look it up yourself on LauderBuild. It takes ninety seconds and it reveals whether the work is actually permitted, what the scope covers, and whether any inspections have been called or passed.
  • Hiring an unlicensed contractor to save money. In Florida, unlicensed contracting is a crime, and the homeowner is the one who bears the consequences. Unlicensed contractors cannot pull permits, which means the work is automatically unpermitted, and if a worker gets hurt on your property, your homeowner’s insurance may not cover it.
  • Skipping permits on a home you plan to sell. Fort Lauderdale buyers and their lenders are increasingly checking permit history before closing. Unpermitted work you did five years ago will surface at the title search, and the retroactive permit will cost more than the original permit would have, with penalties layered on top.
  • Assuming HVAC replacement doesn’t need a permit. In Florida, AC changeouts require a mechanical permit, and in Broward County the new system must meet current HVHZ wind-load requirements for the outdoor unit. Installing without a permit voids manufacturer warranties on some units and creates a code violation that follows the property.
  • Taking the lowest bid without comparing permit scope. A bid that’s $3,000 lower than everyone else usually means one of two things: the contractor is skipping permits, or the permit scope doesn’t match the actual work. Ask every bidder what permits they’ll pull and what inspections they expect. If the answer is “we don’t need permits for this,” get it in writing and then check with the city.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

When to Call a Professional

Some permit situations are straightforward; others are not. Call a licensed contractor when any of these apply: you’re planning work that touches the building envelope, moves plumbing or electrical, or alters any wall; you discover unpermitted work from a previous owner and need to bring it into compliance before selling; you’re buying a Fort Lauderdale home with open permits and need a scope of what it will take to close them; or you’ve received a red tag, stop-work order, or violation notice from the city. Sawyer Remodel Fort Lauderdale offers free estimates in Fort Lauderdale, and if your project involves materials like GAF or Owens Corning roofing, we’ll confirm the product’s HVHZ compliance as part of the permit scope. Call (754) 354-7423 and we’ll walk you through exactly what your specific project needs before any money changes hands.

Frequently Asked Questions

A second-story addition that matches the existing roofline

The Bottom Line

Florida’s permitting system exists to verify that work meets code, and in Fort Lauderdale and Broward County, that code is the strictest in the state because of the HVHZ wind zone. A permit is not an expense; it’s the paper trail that proves your remodel was done right, inspected by the city, and legal to sell. The contractor who suggests skipping permits is asking you to carry a liability that will surface when you sell, in exact proportion to how long you wait. Check the permit history before you buy, verify the permit is closed before you make final payment, and work with a contractor who treats the permitting process as part of the job, not a line item to be avoided. Sawyer Remodel Fort Lauderdale includes the full permit scope, timeline, and fee schedule in every written estimate, so you know exactly what you’re approving before work begins. Call (754) 354-7423 to get your free estimate for your next remodel in Fort Lauderdale.

Written by Luca Romano, Owner at Sawyer Remodel Fort Lauderdale, serving Fort Lauderdale since 2005.

Getting started with Sawyer in Fort Lauderdale

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Fort Lauderdale team

A local crew that works across Fort Lauderdale and the towns around it, to the same written standard as every Sawyer location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Fort Lauderdale? Licensed & insured · Free on-site estimates response · free estimates
Call (754) 354-7423
Local Service Coverage

Request a Free Estimate in Fort Lauderdale

Tell us what you need - Sawyer Remodel Fort Lauderdale responds fast. No obligation.

By providing your information above, you agree to our Privacy Policy and authorize us to contact you via phone, email, or SMS about your request, including by the independent professionals who may fulfill it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch